français term

à maille serrée

français vers anglais Technique / Génie Mines et minéraux / pierres précieuses
La société s'engage à réaliser les travaux ci-après :
- Campagne d'echantillonnage à une maille de 50 x 50 mètres stream sédiment, sol et roche;
- Réalisation de puits et tranchées sur des cibles identifiées;
- Campagne de sondages de reconnaissance sur les cibles identifiées.
- Poursuite de la campagne de sondages à maille serrée, associés aux puits et tranchées;
Proposed translations (anglais)
3 +2 close-mesh / detailed
4 +2 tight pattern, close spacing

Proposed translations

+2
22 minutes
Selected

close-mesh / detailed

Surveys based on a fine grid
Note from asker:
Thank you.
Peer comment(s):

agree Carolingua : grid is better than mesh. Mesh would be used for a physical object, such as a strainer. If you are refererring to a specific geographical area, then grid is the term.
51 minutes
Thanks Carolingua. Yes, "grid" is better!
agree Dr Lofthouse
52 minutes
Thanks Dr Lofthouse.
Something went wrong...
4 KudoZ points awarded for this answer.
+2
1 heure

tight pattern, close spacing

Generally, the system of relatively short BOREHOLES SET WITH TIGHT PATTERN is more efficient as long bore- ...
www.crcnetbase.com/doi/pdf/10.1201/NOE0415374521.ch9

Status of Investigative or Remedial Action: DEQ injected Hydrogen Releasing Compound (HRC) into six BOREHOLES IN A TIGHT PATTERN in the ...
www.deq.state.or.us › Environmental Cleanup › ECSI

you would have to have a really TIGHT PATTERN OF DRILL HOLES, he adds. ... not only across the surface of the parcel, but also into the boreholes, ...
www.digitalmagazinetechnology.com/a/aggregatesmanager/.../p...

TIGHT PATTERN OF DRILL HOLES,” he adds. “The geophysics does a really nice job because you'll ... boreholes. Two boreholes had been drilled a few hundred ...
www.aggman.com/files/2009/06/agrm0409_opsill1.pdf

Due to the CLOSE SPACING OF THE BOREHOLES and the high seismic velocities of the rock strata surrounding the void, the first arrival time is very close ...
https://online.tugraz.at/tug_online/voe_main2.getVollText?.....

BOREHOLES AT CLOSE SPACING or spoon testing of pad footing excavations may be required to confirm that the appropriate quality shale has been encountered. ...
https://majorprojects.affinitylive.com/.../Appendix I - %20Geotechnical.pdf

Note from asker:
Thank you.
Peer comment(s):

agree kashew : I think it's been up before on ProZ.
6 heures
agree B D Finch
8 heures
Something went wrong...
Term search
  • All of ProZ.com
  • Recherche par terme
  • Travaux
  • Forums
  • Multiple search